COMPLETED: Planned Maintenance – LINX (Extreme LAN) Renumbering

What:
As part of the expansion of LINX (the London Internet eXchange), we are required to change IP addressing and configuration with peering partners.

When:
Saturday 17th March 09:00 onwards.

Affecting:
This work is not expected to cause any issues, although the path traffic is routed along will change during the works.  Othello has more than sufficient connectivity to handle the re-routed traffic during the works.