DataCenter Major Engineering Works Power Testing, Upgrades and Replacements What is being done: Replacement of faulty UPS Checking of Breakers and Wiring Failover Testing of Power Systems Following the unexpected power issues at Level3/CenturyLink on 8th and 12th of June which caused major disruptions to all datacentre tenants, they are performing major testing and remedial …
Category: Transit/Connectivity
Jul 11
COMPLETED: Major Engineering Works – Services at Risk
DataCenter Major Engineering Works Power Testing, Upgrades and Replacements What is being done: Replacement of faulty UPS Checking of Breakers and Wiring Failover Testing of Power Systems Following the unexpected power issues at Level3/CenturyLink on 8th and 12th of June which caused major disruptions to all datacentre tennants, they are performing major testing and remedial …
Aug 16
COMPLETED: Planned Maintenance: Server/Service Upgrade and Restart
Planned Maintenance: cPanel Hosting Services Control Panel and Associated Packages Upgrades What is being done: upgrade to new version of Web Host Manager (whm) upgrade to new version of cPanel upgrade add-on packages & script installers In order for the updates to take effect all services will need to go through a graceful restart This will take …
May 12
COMPLETED: Maintenance – Fibre Migration / Recabling GS2-THN
Planned Maintenance: Fibre Migration / Recabling GS2-THN What: Migration of Fibre Routes Global Switch 2 < - > TeleHouse North Affects: All Equipment in Global Switch 2 When: Sunday, 1825th May 2014 08:00 – 16:00 In order to allow for expansion within our GS2 DataCentre Facilities, the fibre-routes between GS2 and THE are being replaced/recabled …
May 12
COMPLETED: Maintenance – Fibre Migration / Recabling GS2-THE
Planned Maintenance: Fibre Migration / Recabling GS2-THE What: Migration of Fibre Routes Global Switch 2 < - > TeleHouse East Affects: All Equipment in Global Switch 2 When: Saturday, 1724th May 2014 08:00 – 16:00 In order to allow for expansion within our GS2 DataCentre Facilities, the fibre-routes between GS2 and THE are being replaced/recabled …
Jun 01
2013-May RIPE Atlas Probe Report
The latest report from our RIPE Atlas Probe has just arrived … This is your monthly availability report for probe 4521. Calculation interval : 2013-05-01 00:00:00 – 2013-06-01 00:00:00 Total Connected Time : 31d 00:00 Total Disconnected Time : 0d 00:00 Total Availability : 100.00% Kind regards, RIPE Atlas Team Another month of 100% network …
Apr 29
COMPLETED: Emergency Maintenance: SW-Routed1
Emergency Maintenance: Switch Routed 1 What: Intermittent Failure of Switch Routed 1 Affects: All routed services When: 2013/04/29 – Various Engineers are onsite preparing a replacement. A further brief outage will be required to replace/swap the failed component. Update 1: 29/04/2013 22:36 – The affected network component has now been fully replaced. We don’t expect …