15:25 – There has been a major power failure in the E14 9xx postcode, affecting supply to our DataCentre at Harbour Quay (2HQ).
Automated Transfer Switches have switched over to our secondary powerfeed, and the generators moved to hot status until the incident is resolved by the power company.
No customer or Othello systems have been affected – all critical and client services are fed from our site-wide 2N+1 Uninterruptable Power Supplies (UPS) fed by 2 diverse power systems, backed up by 2N Generators.